This package aims to enhance water availability through the construction of 2,00,000 Cubic metres, Check Dams, 2,50,000 RMT Contour Bunding, 500 Gabions, 450 Silt Detention Structures, 4,600 Ha of Drainage Line Treatment (DLT) works, 500 Percolation Tanks, and other water harvesting works. Monitoring focuses on engineering quality, measurement verification, and water retention effectiveness